Accomplishment chart, 9/6 – 9/12
Sep. 13th, 2013 06:12 pmFor the week of 9/6 – 9/12:
Writing
- got tapped to edit the script for a new musical
- worked on my edit of the new musical
- 5 blog entries
- 7 daily Hipster Feminist tweets
Theater
- got The Late Mrs. Chadwick accepted in radio theater performance
- had two Boeing-Boeing rehearsals
Larp/Gaming
- ran The Bloom of May tabletop game at WPI’s Gaming Weekend
Modeling
- had three modeling engagements
Sewing/Costuming
- assembled Lucy Harper’s costume for Tom Sawyer
- assembled Sereny Harper’s costume for Tom Sawyer
- assembled Naomi Hollis’s costume for Tom Sawyer
- gathered various other Tom Sawyer costume pieces
Media
- watched episode 9 of Project Runway season 12
Physical
- 1 hour-long circuit workout
- 2 ballet classes
- 30 minutes on the elliptical
Cooking
- made turkey avocado sandwiches
Writing
- got tapped to edit the script for a new musical
- worked on my edit of the new musical
- 5 blog entries
- 7 daily Hipster Feminist tweets
Theater
- got The Late Mrs. Chadwick accepted in radio theater performance
- had two Boeing-Boeing rehearsals
Larp/Gaming
- ran The Bloom of May tabletop game at WPI’s Gaming Weekend
Modeling
- had three modeling engagements
Sewing/Costuming
- assembled Lucy Harper’s costume for Tom Sawyer
- assembled Sereny Harper’s costume for Tom Sawyer
- assembled Naomi Hollis’s costume for Tom Sawyer
- gathered various other Tom Sawyer costume pieces
Media
- watched episode 9 of Project Runway season 12
Physical
- 1 hour-long circuit workout
- 2 ballet classes
- 30 minutes on the elliptical
Cooking
- made turkey avocado sandwiches